CLICK ON EACH PHOTO FOR A DETAILED DESCRIPTION OF PROCESS
POOL POSITIONING AND BUILDING PROCESS
PARTERRE GARDEN WITH ENTRY WALK & STONE PILARS
GRADING & EXCAVATION
The grading and excavation of this project were closely monitored. Gas and utility lines were in close proximity, and existing elevations on either side of the parterre beds were inconsistant. The grade was cut and feathered in order to give a more level appearance before the excavtaion for the parterre curbing began.
PEBBLE MOSAIC DRIVEWAY WITH RADIANT HEAT